Project · Ventilation

Supply and exhaust air for a new production hall

Long ducts and air units on the roof, cabinets with PLC and four SINAMICS drives, operated from a touch panel.

All projects
01The project

Task and solution

The task

A wood-based panel producer was given a supply and exhaust air system with ducts and fan units on the roof for a new high-bay hall.

Our work

We built the cabinets with PLC and four SINAMICS drives, fitted local control boxes and connected the system on the roof. It is operated from a touch panel with visualisation.

02Photos · 8 photos

Got an automation task?
We are listening.

Get in touch