
Project · Ventilation
Ventilation for a new production building in Berlin
Air handling units lifted onto the roof by crane, ducts, pump groups and long cable routes — with cabinets including PLC and drives.
All projects
01The project
Task and solution
The task
A food ingredients producer built a new production building in Berlin. Air handling units went onto the roof, along with ducts, pump groups and cable routes.
Our work
We built the cabinets with PLC and drives, laid the cable routes and connected the air handling units and pumps.
02Photos · 14 photos














03More projects
More of our work

2024–25
12 photos
Ventilation · Exhaust air cleaning
Exhaust air cleaning (RTO) for a film plant
Controls for a regenerative thermal oxidiser: cabinets, fans, dampers, bypass and visualisation.

2023–24
8 photos
Ventilation · Hall ventilation
Supply and exhaust air for a new production hall
Long ducts and air units on the roof, cabinets with PLC and four SINAMICS drives, operated from a touch panel.

2022
9 photos
Ventilation · Building services
Ventilation and building services for a university
New ducts and cooling units on the roof, heating and pump groups — plus the control cabinets with indicator lamps.
