Project · Ventilation

Ventilation for a new production building in Berlin

Air handling units lifted onto the roof by crane, ducts, pump groups and long cable routes — with cabinets including PLC and drives.

All projects
01The project

Task and solution

The task

A food ingredients producer built a new production building in Berlin. Air handling units went onto the roof, along with ducts, pump groups and cable routes.

Our work

We built the cabinets with PLC and drives, laid the cable routes and connected the air handling units and pumps.

02Photos · 14 photos

Got an automation task?
We are listening.

Get in touch