Project · Ventilation
Ventilation for a new clean room area
Large air handling units on the technical floor above the clean rooms — with control cabinet, PLC and six frequency converters.
All projects
01The project
Task and solution
The task
For a new clean room production area, large air handling units, ducts and cable routes were built on the technical floor above it.
Our work
We built the control cabinet with PLC, I/O and six frequency converters, laid the cable routes and fitted the operator panel.
02Photos · 10 photos










03More projects
More of our work

2024–25
12 photos
Ventilation · Exhaust air cleaning
Exhaust air cleaning (RTO) for a film plant
Controls for a regenerative thermal oxidiser: cabinets, fans, dampers, bypass and visualisation.

2023–24
8 photos
Ventilation · Hall ventilation
Supply and exhaust air for a new production hall
Long ducts and air units on the roof, cabinets with PLC and four SINAMICS drives, operated from a touch panel.

2022
9 photos
Ventilation · Building services
Ventilation and building services for a university
New ducts and cooling units on the roof, heating and pump groups — plus the control cabinets with indicator lamps.