Bottom ash processing at a waste incineration plant
Cabinets, installation, visualisation and the lighting for the whole site, for a new line that recovers metals from bottom ash — about 10,000 tonnes a year, according to the operator.
Task and solution
The task
A new bottom ash processing plant was built at a waste incineration plant: conveyors, screens, magnetic drums, eddy current separators and air classifiers on several levels. The plant builder needed the complete electrical side.
Our work
We built all control cabinets in our workshop — incomer, frequency converters and safety equipment — and installed them on site. The plant visualisation is ours as well, and we also installed the lighting for the whole site.
Result
The plant has been running since March 2024 and, according to the operator, recovers about 10,000 tonnes of metal a year.











More of our work

New bottom ash plant in Cologne
For a new processing plant at a waste incinerator we are building distributed I/O cabinets and many local control boxes. The project is under way.

Processing plant in a new recycling hall
From the empty shell to the running plant: new switch room and cabinets with motor starters, drives and PLC for recovering metals.

Sorting plant in a new hall
Conveyors, screens, separators and a control room: cabinets with SEW drives and the installation of the plant came from us.