New bottom ash plant in Cologne
For a new processing plant at a waste incinerator we are building distributed I/O cabinets and many local control boxes. The project is under way.
Task and solution
The task
A new bottom ash processing plant is being built at a waste incineration plant in Cologne. For the electrics at the machines, the plant builder needs distributed I/O cabinets and many local control boxes and isolators.
Our work
Since May 2026 we have been building the cabinets and boxes in our workshop in Lage. On site, the steel structure and the cable pits are going up.









More of our work

Bottom ash processing at a waste incineration plant
Cabinets, installation, visualisation and the lighting for the whole site, for a new line that recovers metals from bottom ash — about 10,000 tonnes a year, according to the operator.

Processing plant in a new recycling hall
From the empty shell to the running plant: new switch room and cabinets with motor starters, drives and PLC for recovering metals.

Sorting plant in a new hall
Conveyors, screens, separators and a control room: cabinets with SEW drives and the installation of the plant came from us.